How are Flexitanks installed in containers?
Conventional flexitanks require the lining of the container with carton boards and installation of a bulkhead system at the door side of the container. This procedure takes about 40 minutes on average. There is one flexitank design, patented by LiquA, which does not require bulkheads and takes 3 minutes to install.
Benefits of Using Flexitanks
- How do Flexitanks reduce the risk of contamination?
- Are Flexitanks suitable for transporting hazardous materials?
- What size valves do flexitanks use?
- Are Flexitanks Compatible with All Container Types?
- Can Flexitanks Be Used in Any Container?
- How are Flexitanks installed in containers?
- What is a Bulkhead and Why is it Used?
- Is there a flexitank that does not require bulkheads?
- What are the temperature limits for Flexitank usage?
- How is the quality of Flexitanks ensured?
- What safety measures are in place for using Flexitanks?
- Are there international regulations governing the use of Flexitanks?
- How do Flexitanks comply with food safety standards?
- What are the common risks associated with Flexitanks, and how are they mitigated?
- What is “container bulging” and why does it occur?
- Is there a flexitank that does not bulge the side walls of the containers?
- How does LiquA prevent the bulging problem?
- How are Flexi-Bags fitted into Shipping Containers?
- How Long Does It Take to Fit/install a Flexitank?
- What equipment is needed for Flexitank installation?
- What training is required for handling Flexitanks?
- What is the Lifespan of a Flexitank?
- What is the expiry time of flexitanks?
- How should Flexitanks be maintained?
- How can leaks in Flexitanks be prevented?
- What should be done in case of a Flexitank failure?